Reserves
The initial exploratory phase identified potential resources of 3 million metric tons (MT) with Mn grades between 44% and 52%. There are plans to do more geological studies on unexplored areas to potentialy find more Manganese sites. At the current mining rate of 10,000 MT per month, the estimated mine lifespan is 50 years
Current Mining Operations
Exploratory drilling confirmed significant manganese occurrences; ore-rich zones have been mapped.
Trenching and sampling demonstrated consistent manganese mineralization, with detrital ore overlying primary manganese bodies.
The mine is legally authorized to extract 60,000 MT per year, which allows for 10,000 MT per month over the next six months.
Once production begins, our legal team will initiate the process to increase the permitted volume to 120,000 MT per year.
Monthly mining capacity may also be expanded further as operations scale.
Expansion Plans
The project aims to increase production capacity through additional exploration, resource quantification, and process optimization. Future drilling campaigns and investment in advanced processing technologies will support higher extraction rates and ensure long-term sustainability.
Last updated