Reserves
The initial exploratory phase identified potential resources of 3 million metric tons (MT) with Mn grades between 44% and 52%. There are plans to do more geological studies on unexplored areas to potentialy find more Manganese sites. At the current mining rate of 5,000 MT per month, the estimated mine lifespan is 50 years
Current Mining Operations
Exploratory drilling campaigns have confirmed significant manganese occurrences where ore-rich zones have been mapped.
Trenching and sampling have demonstrated consistent manganese mineralization, with detrital ore overlying primary manganese bodies.
Mining operations currently focus on 5,000 MT/month, leveraging existing equipment and infrastructure for efficient extraction.
Expansion Plans
The project aims to increase production capacity through additional exploration, resource quantification, and process optimization. Future drilling campaigns and investment in advanced processing technologies will support higher extraction rates and ensure long-term sustainability.
Last updated